Krutikhin А. Д., & Kuznetsov А. П. (2011). Study of Influence of Organizational and Technical Level on Interoperation Breaks Part in Total Length of Production Lead Time. Intellekt. Sist. Proizv., 6(1), 109–113. Retrieved from https://izdat.istu.ru/index.php/ISM/article/view/1777