Grakhov Валерий Павлович, and Mushakov Денис Анатольевич. “Development of Controlling the Progress of Construction and Installation Works Based on the Interaction of Primavera P6 Professional R8.3.2 and ArchiCAD 17.0.0”. Intellekt. Sist. Proizv. 13, no. 1 (July 7, 2015): 95–98. Accessed November 5, 2026. https://izdat.istu.ru/index.php/ISM/article/view/1933.