Factors Restricting the Application of Modern BIM-Technologies in Reconstruction Projects

Authors

  • E. M. Korshunova Saint-Petersburg State University of Architecture and Civil Engineering, Saint-Petersburg
  • N. L. Taranukha Kalashnikov ISTU, Izhevsk
  • P. A. Borshova Kalashnikov ISTU, Izhevsk
  • A. F. Korshunov Kalashnikov ISTU, Izhevsk

DOI:

https://doi.org/10.22213/2410-9304-2020-3-53-57

Keywords:

building information modeling, reconstruction projects, use of BIM, decision-making

Abstract

The paper identifies factors that impede the use of building information modeling (BIM) in reconstruction projects. Reconstruction projects face a high level of uncertainty during implementation, mainly due to inadequate information management, insufficient quality control and low competence of participants. The use of advanced computer tools, such as BIM, which are used with both advanced information and communication technologies (ICTs), can be a way to solve the problems of reconstruction projects. The analysis of the existing models of information modeling used in construction projects of buildings and their brief characteristics are given. To identify problems, the introduction of BIM in reconstruction projects is proposed using the method of analytical hierarchy (MAI). The stages of the analysis of factors limiting the use of BIM in reconstruction are determined. Based on the analysis of the most significant technical, organizational and managerial problems in applying modern technologies in reconstruction projects, factors that limit the use of BIM in reconstruction projects are identified. The necessity of monitoring these factors throughout the entire project life cycle is substantiated. The tools and actions that could eliminate the identified factors and increase the effectiveness of projects are analyzed.

References

Коршунова Е. М., Вишнивецкая А. И. Современные проблемы развития застроенных территорий // Вестник гражданских инженеров. 2018. № 2 (67). С. 258–263.

Коршунова Е. М. Проблемы реконструкции сложившейся застройки центра Санкт-Петербурга // Экономическое возрождение России. 2009. № 4. С. 67–70.

Хохлов О. Б. Оценка эффективности проектов и программ реновации жилищного фонда : дис. … канд. экон. наук: 08.00.05 // Томск: Томский. гос. архит.-строит. ун-т, 2006. 188 с.

Овсянников С. Н., Овсянников А. Н. Перспективы реконструкции жилых домов первых массовых серий в г. Томске // Вестник ТГАСУ. 2010. № 2. С. 105–112.

Volk R., Stenge, J., Schultmann F. 2014. Building InformationModels (BIM) for existing buildings – literature reviewand future needs, Automation in Con-struction 38: 109–127. https://doi.org/10.1016/j.autcon.2013.10.023.

Pavlovskis M., Antucheviciene J., Migilinskas D. 2016. Application of MCDM and BIM for evaluation of asset redevelopment solutions, Studies in Informatics and Control 25(3): 293–302. https://doi.org/10.24846/

v25i3y201603.

Вечелковский Б. Е. Анализ ключевых факторов внедрения технологии информационного моделирования зданий в современном строительстве // Современная техника и технологии. 2015. № 1. С. 114-117.

Saaty T.L., Figueira J., Greco S., Ehrgott M. 2005. The analytic hierarchy and analytic network processes for the measurement of intangible criteria and for decision-making, in Multiple criteria decision analysis: State of the art surveys. Springer, 345–408.

Zavadskas E.K., Antucheviciene J., Turskis Z., Adeli H. 2016. Hybrid multiple-criteria decision-making methods: A review of applications in engineering, Scientia Iranica. Transaction A, Civil Engineering 23(1): 1–20.

Zhao X. 2017. A scientometric review of global BIM research: Analysis and visualization, Automation in Construction 80: 37–47. https://doi.org/10.1016/j.autcon.2017.04.002.

Гавриэлова А. Несбыточная реновация // MR7. ru. URL: https://mr-7.ru/articles/199177.

Бузырев В. В. Реновация жилых домов как важный фактор увеличения жизненного цикла жилищного фонда в регионе // Проблемы современной экономики. 2012. № 4 (44). С. 285–288.

Published

17.11.2020

How to Cite

Korshunova Е. М., Taranukha Н. Л., Borshova П. А., & Korshunov А. Ф. (2020). Factors Restricting the Application of Modern BIM-Technologies in Reconstruction Projects. Intellekt. Sist. Proizv., 18(3), 53–57. https://doi.org/10.22213/2410-9304-2020-3-53-57